Customer stories overview

Energyst guarantees power for the world’s biggest transport ship 

Energyst provided three 1000 kVA generator sets, one of which acted as a back-up generator set to the world’s largest transport ship during transportation of the SBX platform from the Gulf of Mexico via South America to its final destination in the Pacific Ocean.


 
Extra power supply for the renovation of a navy supply ship 

Energyst supplied extra power during the renovation of the Dutch Navy's supply ship. The entire exterior of the ship was taken in hand, and both of the main engines were reconditioned, which requested a lot of extra power.


 
Contact Us

Telefon

Vi er her for deg å svare på alle dine spørsmål

Vi vil kontakte
deg innen 24 timer

Energyst lokalt

Løsninger over hele verden

To see addresses and phones of our representations, simply press on a country at the left.
Search

 

Customer story
Rental Power for the Opening and Closing ceremonies, Olympic Games 2004

Energyst provided power supply during opening and closing ceremonies for the Olympic games 13 and 29th August 2004 and Paralympics games 17 and 28th September 2004.

Inventory Sales

At Energyst you can buy equipment that no longer meets the requirements for of the most attractive rental market segments.

Click here to read Energyst's high efficiency chiller case study